Plastics factory in the Vasiliko industrial zone, Evia - Evropaika Plastika Fylla Ltd

Plastics factory in the Vasiliko industrial zone, Evia - Evropaika Plastika Fylla Ltd

Steel warehouse


Wide-span building of 32 meters, with a double overhead crane and an interior column

Plastics factory in the Vasiliko industrial zone, Evia

Wide-span building of 32 meters, with a double overhead crane and an interior column. The floor level was raised above the existing ground, and the floor subbase was placed and compacted in layers.

Area: Evia


Project architect:

Dimitrios Manis

Architect, Dipl.-Ing. RWTH Aachen

Eretria, Evia


Services we provided: Building Permit, Structural design


The construction step by step

Photos from the site, from the erection of the frame to the completion of the building.

Main facade of a steel industrial building with industrial doors and a row of windows, Eretria, Evia
Main facade with industrial doors and a strip of windows
Erection of the steel frame of the plastics factory, Vasiliko industrial zone, Evia
Frame with a 32 m span. It could have been built without an interior column, but we added one interior row because the client wanted a double overhead crane
Ridge connection with bracing at the factory in the Vasiliko industrial zone
Ridge connection detail
Steel frames going up with a crane truck at the factory in the Vasiliko industrial zone
The frame in progress
Installing rock wool and panels on the factory walls, Vasiliko industrial zone
Installing rock wool on the inside
Interior of the plastics factory with the frame and insulation rolls, Vasiliko industrial zone, Evia
With a metal sheet lining, the interior takes on a clean industrial look
Detail of the metal sheet lining of the roof and walls inside, Vasiliko industrial zone
Detail of the metal sheet lining of the roof and walls inside, Vasiliko industrial zone
The completed plastics factory clad in metal sheet, Vasiliko industrial zone, Evia
The completed plastics factory clad in metal sheet, Vasiliko industrial zone, Evia
With a metal sheet lining, the interior takes on a clean industrial look, plastics factory in the Vasiliko industrial zone, Evia-Evropaika Plastika Fylla Ltd
With a metal sheet lining, the interior takes on a clean industrial look
 
 
Map of Greece showing where Econ has built

The map shows where we have built in Greece. Click a pin to see the project.

Contact

+30 216 0701953

PHONE

(Before calling, please email us a short description of your project. It makes the first call much more useful.)

E-mail

20 Synesiou Kyrinis St., Lycabettus,
Athens 11471, Greece

Facebook  |  X

©2026 Econ steel frame buildings