Steel fabrication in Karystos, Evia - Tsitakis Dimitris & Co OE

Steel fabrication in Karystos, Evia - Tsitakis Dimitris & Co OE

Steel building


A typical Econ building with a color combination chosen by the client and stainless steel windows on the facades as a sample of the client's own work.

Steel fabrication in Karystos, Evia

A typical Econ building with a color combination chosen by the client and stainless steel windows on the facades as a sample of the client's own work. The frames were designed from the start for the loads of the overhead crane the client asked for. Before submitting for the permit, we adjusted the architectural drawings to the grid of the steel frame, so that the floor plan and the structure work together.

The construction step by step

Photos from the site, from the foundation to the completion of the building.

Completed steel workshop building with panel wall cladding and windows, Karystos, Evia
Main elevation of the building with panel wall cladding
foundation
Foundation
Steel frame with overhead crane brackets during construction in Karystos
Frame construction stage. The overhead crane brackets are visible
Completed steel frame ready for panels in Karystos, Evia
Frame completed and ready to receive the panels.
Lifting part of the roof with a crane onto the steel frame in Karystos
Lifting part of the roof with a crane onto the steel frame in Karystos
Erecting a lattice truss with a crane truck in Karystos, Evia
Erecting a “box” assembly
Final view of the steel building with panels and wind turbines in the background in Karystos
Final view of the steel building with panels and wind turbines in the background in Karystos
Strip footing rebar next to steel formwork, workshop building in Karystos, Evia
Strip footing rebar next to steel formwork
Rebar for the walls and strip footings with forms, foundation of a steel building in Karystos, Evia
Rebar and forms for the foundation walls
Pedestal rebar for a steel column inside the formwork, building foundation in Karystos, Evia
Column pedestal starter bars inside the formwork
Formwork and shoring for the foundation walls before the concrete pour, steel building in Karystos, Evia
Formwork for the foundation walls before the concrete pour
Placing lattice roof trusses on steel columns, frame erection in Karystos, Evia
Placing the roof trusses on the columns
Gable of the completed steel building with panel wall cladding, workshop in Karystos, Evia
Gable of the completed building
Side view of the steel building with a canopy and paved yard, Karystos, Evia
Side view with entrance canopy and landscaped surroundings
Side view of the steel building with a stainless steel sliding door in Karystos, Evia
Side view of the steel building with a stainless steel sliding door in Karystos, Evia
Steel building with gray panels, blue trim and a stainless steel door in Karystos
Steel building with gray panels, blue trim and a stainless steel door in Karystos
The varied layout of the openings, based on how the building works inside, looks good from the outside, Steel fabrication in Karystos, Evia-Tsitakis Dimitris & Co OE
The varied layout of the openings, based on how the building works inside, looks good from the outside

The varied layout of the openings, based on how the building works inside, looks good from the outside

The client made the stainless steel details himself, since the company housed in the building works in custom steel fabrication.

 
 
Map of Greece showing where Econ has built

The map shows where we have built in Greece. Click a pin to see the project.

Contact

+30 216 0701953

PHONE

(Before calling, please email us a short description of your project. It makes the first call much more useful.)

E-mail

20 Synesiou Kyrinis St., Lycabettus,
Athens 11471, Greece

Facebook  |  X

©2026 Econ steel frame buildings